ENVIRONMENTAL CLERALCE CONDITION & ENVIRONMENTAL COMPLIANCE AUDIT
- Site surveys
- Walkthrough surveys of site to assess the site thoroughly, systematic identification of the environmental risks and environmental liabilities associated with activities at your site;
- Discussions with Senior Personnel from our factory and study of manufacturing activities undertaken & future development proposals.
- Regulatory Research
- Environmental Clearance (EC) and check their compliance with the acceptable lim its and reports variance if any;
- Consent to Operate (CTO) and check their compliance with the acceptable limits and reports variance if any;
- Notice of Directions / Closure Orders issued by the MPCB during last 2 years;
- Any litigation pending;
- Environmental/Health and Safety Management as per applicable standards.
- Data Analysis
- Study the manufacturing process for the related plot in reference from
- the point of view of effluent generation, air pollution and solid waste generation.
- Source of water supply, its consumption and effluent generation shall be counter checked by EC/Consent conditions.
- Adequacy study of effluent treatment plant and Sewage treatment plant
- Sources of air pollution and adequacy of control devices shall be reported. A comparison will be made with limits imposed by authorities and report will be submitted.
- Method of collection of wastes (Solids or liquids) shall be reviewed and their effectiveness assessed. Possibility of any contamination in soil or ground water shall be reported.
- JVS reports / third party reports of air monitoring, effluent monitoring will be studied and compliance / variations etc. will be reported.
- Study the existing environmental related documents like MPCB consent, environment statement, Hazardous waste manifest, form 4 and other related documents such as MPCB notices, proposed directions, if any
- Status of pollution control devices and their effectiveness will be reviewed.
- A summary of your key findings and recommendations will be presented to your client.
- Preparation of the Audit Report and submission to your
- Training Requirement
We will identify training requirement and will conduct training session regarding EC & Environmental Compliance.
Time Requirement: –
Site Audit: The entire audit will be conducted in 2-3 days.
Summary of Key findings & Recommendations: 4-5 days after audit.
Report Preparation & Submission: 2 weeks from completion of site visit & Audit depending upon the availability of the required information / documents/ License copies with Client.
Audit Methodology: Physical Survey & Document verification as evidences.
CLIENTS SCOPE OF WORK: –
- Industry Should nominate knowledgeable & Competent persons from the various department to discuss the manufacturing process / documentation etc.
- Industry shall provide documents like EC copy, Consent copies, MPCB portal Log in ID & Password to identify the compliance list prior to site visit once PO is issued.
- All the lay outs / Drawings/ Technical details/ process flow diagrams/ Monitoring & Analysis reports etc. shall be provided by industry as and when demanded for study & verification.
- The data regarding RM Consumption / Production/ waste Generation & Disposal shall be made available by industry when demanded.